💡
Thought Shares
Log In
Loading…
Construction Tech - Thought Shares
c/construction-tech
11
c/construction-tech
•
kim.jake
•
19h ago
Can we talk about how I used to carry 4 sets of paper drawings to every site walk
0 comments
Share
17
c/construction-tech
•
paige331
•
2d ago
Warning: Our daily site reports went from 3 hours of paperwork to 20 minutes after switching to a tablet app last month
0 comments
Share
1
c/construction-tech
•
wade871
•
3d ago
I thought QR codes on jobsite drawings were a gimmick until our super in Plano tried it
1 comments
Share
9
c/construction-tech
•
nathan901
•
4d ago
Hit 63% utilization on our last pour and the boss thinks that's a win
1 comments
Share
19
c/construction-tech
•
hall.joel
•
6d ago
PSA: the flagger on our site in Dayton said something that changed how I plan pours
0 comments
Share
12
c/construction-tech
•
sage_green
•
6d ago
Unpopular opinion: the $60 laser level I grabbed at a flea market in Reno beats the one my old company spent $400 on
0 comments
Share
25
c/construction-tech
•
linda114
•
8d ago
Am I the only one who thinks tablet takeoff is slower than paper for small reno jobs?
1 comments
Share
1
c/construction-tech
•
jana309
•
8d ago
Switched from cloud takeoff software to a $30 scale ruler on one job and the cloud one missed 11 studs
1 comments
Share
21
c/construction-tech
•
piperbailey
•
9d ago
The foreman in Tulsa made us stop using the laser level for a week, and it fixed our layout problems
0 comments
Share
18
c/construction-tech
•
mary_west
•
9d ago
Warning: the 811 markout crew in San Antonio taught me one thing about utility lines that stuck
0 comments
Share
11
c/construction-tech
•
hugoj12
•
11d ago
Watched a 60 unit apartment job in Reno go from 14 day floors to 4 day floors in 8 weeks
0 comments
Share
22
c/construction-tech
•
tyler854
•
11d ago
Spent $1,200 on a drone mapping setup that couldn't handle a single job site
1 comments
Share
21
c/construction-tech
•
mason_lopez
•
12d ago
I finally figured out why my crews kept measuring off the same crooked corner, it was the laser level mount, not the guys
1 comments
Share
3
c/construction-tech
•
spencer_park26
•
12d ago
Walked a job site in Boise last week and the whole crew was scanning QR codes on the framing
1 comments
Share
12
c/construction-tech
•
karen361
•
12d ago
My tablet died mid inspection at a site in Tulsa, so I started taking photos with my phone and syncing them to the app
1 comments
Share