3
I toured a new prefab housing plant in Boise and their detail drawings were a mess
They had a whole wall of printed plans for a modular unit, and the section cuts didn't even line up between sheets. It's like they never check for coordination before they send it to the floor. How do shops that sloppy even stay in business?
3 comments
Log in to join the discussion
Log In3 Comments
wyatt_mitchell265d ago
Saw a set of shop drawings once where the door swings were wrong on every single elevation. Contractor had to just guess which way they opened lol.
1
holly_reed555d ago
Sounds like the contractor got a chance to use some common sense for once.
1
sandra_bennett595d ago
Contractors have to follow plans for a reason, even if they seem off. Wyatt_mitchell26's story shows how guessing can go wrong.
1